What is a clean agent suppression system?

An automatic fire suppression system (firesuppression) using clean agents releases gas or chemical agent into a sealed room when a fire is detected, without using water, so electrical and electronic equipment is not damaged.

It suits areas holding high-value assets where water cannot be used — server rooms, data centres, electrical control rooms, document archives and generator rooms. Each agent has different properties, so the choice should match the room size and how the space is used.

Choose the right agent for your space

Click through for the technical detail of each system

HFC-227ea

FM200

The most widely used clean agent. Discharges within 10 seconds and needs little cylinder storage space — ideal for small to medium server rooms.

View details
FK-5-1-12

NOVEC 1230

Very low GWP and environmentally friendly. Stored as a liquid at atmospheric pressure and safe for electronic equipment.

View details
Nitrogen 100%

IG100

Pure nitrogen that leaves no residue and has zero ozone impact — suited to large rooms and industrial areas.

View details
Nitrogen clean agent

NN100

A nitrogen system for spaces that need a non-conductive agent that is safe for both people and assets.

View details

FIRE SUPPRESSION

FM200 & NOVEC clean agent systems

FM200 & NOVEC clean agent systems

Automatic suppression with FM200 (HFC-227ea) and NOVEC 1230 (FK-5-1-12). Discharges within 10 seconds, leaves no residue and is safe for electronic equipment.

Request a quotation
Nitrogen IG100 & NN100 systems

Nitrogen IG100 & NN100 systems

Inert gas suppression using IG100 and NN100 nitrogen, as well as CO2 systems. No residue, no ozone depletion — suited to large rooms and industrial areas.

Request a quotation
Suppression system maintenance

Suppression system maintenance

Inspection and weighing of agent cylinders, testing of detectors and control panels, inspection of nozzles and pipework, with an engineer-certified report.

Request a quotation
PM — alarm valve / deluge valve / pre-action

PM — alarm valve / deluge valve / pre-action

Preventive maintenance of alarm valves, deluge valves and pre-action systems to NFPA 25, keeping the system ready to operate.

Request a quotation

Scope of work

  • System design and agent quantity calculation to NFPA 2001
  • Installation of cylinders, nozzles, pipework and release control panels
  • Installation of cross-zone detection, manual release and abort stations
  • Commissioning and room integrity testing
  • Annual inspection and cylinder weighing
  • Refilling of FM200, NOVEC 1230, IG100 and NN100
  • Maintenance of alarm valves, deluge valves and pre-action systems
  • Engineer certification reports for the annual building inspection
Request a free quotation
Fire suppression system maintenance

See our work in action

Frequently asked questions

Which rooms suit an automatic suppression system?
Sealed rooms holding assets easily damaged by water — server rooms, data centres, main distribution boards, electrical control rooms, document archives and generator rooms. The room must be tight enough to hold the agent for the period required by the standard.
How often must agent cylinders be weighed?
NFPA 2001 requires inspection and weighing at least once a year. If agent weight or pressure falls below the limit, the cylinder must be refilled or replaced immediately so the system still performs as designed.
Are clean agents dangerous to people?
Clean agents such as FM200 and NOVEC 1230 are designed for occupied spaces at standard design concentrations, but the system must still include a pre-discharge alarm and an abort station so occupants can leave in time. CO2 systems are life-threatening and must not be used in normally occupied areas.
How long does installation take?
It depends on room size and system complexity. A medium-sized server room typically takes 1-2 weeks from installation to completed commissioning. We survey the site and confirm a clear schedule before starting.

Free consultation

By our engineers and specialists — reply within 24 hours

💬LINE 📞Call 📘Facebook